We believe a complex project can become simple with the right team focused on a common goal. While we prefer to solve your problems before they occur, we can add value at any point in the real estate development cycle.

Cambridge, MA
Client: Homeowners Rehab Inc. (HRI)
Architect: ICON Architecture
Contractor: NEI General Contracting
Completion Date: End of 2026
4 Mellen Street restores a prominent, nationally-registered historic building that once served as the Lesley University admissions building and originally as the 1860’s home of a Cambridge mayor. A six-story Passive House addition creates 29 new affordable homes on a difficult, tight site. As OPM and Clerk of the Works, TDS personnel completed a detailed drawing review to identify issues early so the design team could resolve them before construction. When structural problems were uncovered in the existing foundation, TDS closely managed the budget and all change orders, helping the team balance the Cambridge Historical Commission’s preservation requirements with modern energy performance goals. TDS also oversaw the air sealing and insulation work to ensure the project met both Enterprise Green Communities and Passive House standards.

Austin,TX
Client: L+M Development & Silver Tree Residential, LLC
Architect: Inglese Architecture + Engineering
Contractor: ETC Companies LLC
Completion Date: TBD
Scope: The comprehensive renovation of Travis Park Apartments brings new life to a long-standing community in Austin, TX. Modern kitchens and bathrooms and fully accessible units will preserve the livability of these 199 town homes for many years to come. Mold discovered mid-construction behind HVAC systems and kitchen cabinetry presented challenges for this occupied rehabilitation. As the Owner’s Representative, TDS fostered productive communication among all parties to minimize disruption and maintain construction quality and safety. Improved ventilation, modern mechanical systems, energy-efficient windows, patio doors, and lighting will ensure that the units will remain durable, healthy, and efficient homes for all the residents.

Westbrook, ME
Client: QuakerLane Associates
Architect: SimonsArchitects/ Lever
Contractor: ZachauConstruction
Completion Date: Late2027
Scope: Every development project begins with a vision, and on this Mass Timber project at Dana Street, our role has been to transform that vision into reality. Early on, the owner needed clarity: Could the design they loved truly fit within their budget and schedule? To answer that, we paired them with a general contractor experienced in providing real-time insight on construction costs and schedules. We also introduced the owner and contractor to Blueprint Robotics, a leader in panelized construction and Mass Timber systems, crafting solutions to control costs without compromising the sophistication needed to succeed in Boston’s competitive real estate market. By rethinking traditional methods and leveraging modular building solutions, the project now benefits from significant time and cost savings without sacrificing design quality.

Revere, MA
Client: The Neighborhood Developers (TND)
Architect: MASS Design
Contractor: Bald Hill Builders
Completion Date: TBD
Scope: Innovative Mass Timber Glu-Lam and CLT construction gave our client an extra floor of beachfront affordable living units within zoning limits, compressed construction time by several weeks, allowed stairs to be accessible without waiting for framing, eliminated wet slab construction, and housed the new residents in warm, quiet, and sustainable homes. TDS provided OPM services on this Passive House project from initial design through construction.

Dorchester, MA
Client: Codman Square NDC
Architect: JGE (Jonathan Garland Enterprises)
Contractor: TBD
Completion Date: Fall 2026
Scope: Dealing with “dirty dirt” on a tight urban infill site and a funding-accelerated timeline added to the normal challenges presented by construction. In the end, 15 fortunate families will own new affordable condominiums in these three energy-efficient buildings under the Boston Mayor’s Office of Housing’s Welcome Home program. Architect JGE followed the principles of Zero Emissions design -providing high-quality, energy-efficient windows and insulation, HVAC systems, and lighting in complying with Massachusetts’ Stretch Code and the City’s requirements for LEEDSilver certifiability.

Boston, MA
Client: Allston Brighton CDC
Architect: Onion Flats Architects
Contractor: Haycon Building Corp.
CompletionDate: May 2025
Scope: On our first wood fiber insulation project, we achieved significant savings by combining early plan review and value engineering with careful management of change orders related to unanticipated structural repairs in this 120-year-old building. The resulting contingency fund surplus was applied toward construction of a high-performance, Passive House exterior envelope and hyper-efficient HVAC systems -reducing energy consumption per square foot to 69% of conventional code construction. All 20 affordable units will enjoy enhanced comfort and low utility bills while knowing they have significantly reduced carbon emissions.

Boston, MA
Client: Back of the Hill CDC
Architect: Mix Design and Development LLC
Contractor: Various
Completion Date: Summer 2022
Scope: TDS is assisting Back of the Hill CDC in the execution of a new model of affordable homeownership development. Instead of relying on state and federal subsidies to create this affordability, BOTH CDC is exploring a direct connection to sellers, allowing them to capture the tax incentives of selling to BOTH CDC at below market prices. BOTH CDC then packages these acquisitions savings with a renovation geared to affordability and passes those savings onto new homeowners. TDS helped develop the proforma, retained all third-party consultants, and helped the Owner act as its own general contractor, directly hiring all subcontractors.

Somerville, MA
Client: E3 Development LLC
Architect: Placetailor
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: TDS is providing E3 Development with Owner’s Project Management andClerk-of-the-Works services for the new construction of a 16-unit midrise building in Somerville. The building, designed by Placetail will be PassiveHouse Certified, and a leader in the field of energy efficiency. TDS helped the Owner and Contractor overcome last minute budget issues during times of extreme price volatility in the spring of 2022by value engineering the design and developingcreative risk-share provisions in the contract.

Chicago, IL
Client: Broder
Architect: Pappageorge Haymes Partners
Contractor: Macon Construction
Completion Date: 2019
Scope: Doug Tierney served as Owner’s Representative during the new construction of 53 units of luxury residences in Chicago’s Lincoln Park and Lake view neighborhoods. Building amenities include a fitness center, a spectacular roof deck with views of downtown Chicago, bike storage and repair areas, and a dog spa.

Cambridge, MA
Client: Just-A-Start Corporation
Architect: RODE Architects, Inc
Contractor: Callahan Construction Managers
Completion Date: 2026
Scope: TDS is the Owner’s Representative for this mixed-use, 107-unit, Passive House certified new Smart Growth development in Cambridge, MA. New Street is one of the first projects to be planned under the City’s new Affordable Housing Overlay (AHO) Zoning District, designed to help affordable housing developers create new, permanently affordable homes more quickly, more cost effectively, and in areas of the city where there are currently fewer affordable housing opportunities. The AHO allows the creation of new, permanently affordable housing that is denser than what might be allowed under base zoning and creates a new review process through which new affordable housing can be approved more efficiently.

Boston, MA
Client: Allston Brighton CDC
Architect: The Narrow Gate
Contractor: Bald Hill Builders
Completion Date: Winter 2023
Scope: TDS provided Clerk-of-the-Works and Owner’s Project Management services for the renovation of an existing building into 15 units, 14 of which are permanently affordable supportive housing units for extremely low-income individuals in recovery. Peter Rex oversaw the construction process for Allston Brighton CDC, targeting opportunities for cost savings and ensuring a timely delivery.
Hudson, MA
Client: Metro West Collaborative Development
Architect: Davis Square Architects
Contractor: L.D. Russo
Completion Date: 2025
Scope: TDS is working with Metro West Collaborative Development to create 40 new units of affordable housing in Hudson, Massachusetts. This 100% electric project will utilize heat pumps for both space heating and domestic hot water, and will achieve Passive House certification once complete. TDS is providing both pre-construction services and Owner's Project Management services through the completion of this project.

Pelham, MA
Client: Home City Development
Architect: Architecture EL
Contractor: Western Builders Inc
Completion Date: TBD
Scope: The Amethyst Brook Apartments consist of a new 28 unit Passive House building at the site of the former Montague Fly Rod Factory, and a new 6 unit building with historic detailing to match the character of the larger site. The complex project involves significant retaining walls, wetland adjacencies, ledge, and significant elevation changes. TDS is providing pre-construction services, including design reviews and value engineering.

Randolph, MA
Client: Preservation of Affordable Housing
Architect: ICON Architecture
Contractor: South Coast Improvement Company
Scope: TDS is providing refinancing scope and pricing review as well as construction oversight for occupied UFAS upgrades. This includes upgrades for site accessibility, sustainability goals, elective electrical infrastructure, and previously deferred repairs to these three buildings, each consisting of three residential stories totaling 104 units which border the Bear Swamp Conservation Area.

Lynn, MA
Client: Preservation of Affordable Housing
Architect: ICON Architecture
Contractor: South Coast Improvement Company
Scope: TDS is providing refinancing scope and pricing review as well as construction oversight for occupied UFAS upgrades. This includes upgrades for site accessibility, sustainability goals, elective electrical infrastructure, and previously deferred repairs to these five- to six- story buildings located on four separate sites totaling 321 units constructed in the late 60s.

Somerville, MA
Client: Preservation of Affordable Housing (POAH)
Architect: ICON Architecture
Contractor: Dellbrook /JKS, Lab 9
Completion Date: 2025
Scope: The redevelopment of Clarendon Hill apartments involves the demolition of three buildings of dilapidated 1940’s housing stock and the new construction of an168-unit modular housing complex.

Somerville, MA
Client: Somerville Community Corporation
Architect: Davis Square Architects
Contractor: TBD
Completion Date: TBD
Scope: This property is part of the 100 Homes Program, a partnership with the City of Somerville and the Massachusetts Housing Investment Corporation, with significant support from local Community Preservation Act funds, which combats speculation and the displacement of local tenants from Somerville’s existing housing stock. Eli Herman is serving as Owner's Project Manager during the renovation of this two-family, three-story home.
Arlington, MA
Client: Housing Corporation of Arlington
Architect: Davis Square Architects, Inc.
Contractor: Delphi Construction
Completion Date: December 2021
Scope: The two Downing Square / Broadway Initiative projects are composed of three new low-and mid-rise buildings on challenging sites in Arlington, Massachusetts. The wood framed buildings all meet the new Stretch Energy Code, with detailed air sealing, compartmentalization between units, and continuous exterior insulation. The ground floor of the mixed-use Broadway project will be the new home of the Arlington Eats Market.

Beverly, Danvers, Peabody & Salem, MA
Client: Preservation of Affordable HousingArchitect: ICON Architecture
Contractor: South Coast Improvement Co.
Completion Date: TBD
Scope: TDS is providing refinancing scope and pricing review as well as construction oversight for occupied UFAS upgrades. This includes upgrades for site accessibility, sustainability goals, elective electrical infrastructure, and previously deferred repairs to these five to six story buildings located on four separate sites totaling 321 units constructed in the late 60's.

Yarmouth, MA
Client: Commonwealth Community Developers
Architect: Winslow Architects, Inc
Contractor: Delphi Construction
Completion Date: End of 2021
Scope: TDS has provided plan reviews and project management services to the developer of Yarmouth Gardens, delivering 40 new affordable units on the site of the former Yarmouth Gardens Motor Lodge. The old motor lodge is making way for two new 2-story buildings featuring contemporary design, competitive amenities, desirable floor plans and high-end designer finishes. The development will offer 40 one-, two-, and three-bedroom affordable apartment rentals in a family-friendly community conveniently located near local shopping, dining, and recreational opportunities. Accessible units are designed to accommodate mobility and/or sensory impairments. TDS' John Cavacas is serving as Clerk-of-the-Works.
Mashpee, MA
Client: Preservation of Affordable Housing (POAH)
Architect: Dream Collaborative
Contractor: Delphi
Completion Date: Summer 2024
Scope: The construction of LeClair Village at 950 Falmouth Road in Mashpee will provide 39 new units of critical affordable housing to Cape Cod. TDS’ John Cavacas is providing both Owner’s Project Management and Clerk-of-the-Works services.

Methuen, MA
Client: Standard Communities
Architect: Union Studio
Contractor: Iron Fish Construction
Completion Date: 2023
Scope: TDS is providing plan review, pre-construction, and project management services for the common area upgrades to Mill Falls Apartments. The project includes replacement of all common area finishes, and a reconfiguration of the ground floor lobby, mail room, and management office spaces. In addition, the scope includes installation of new exterior lighting along the façade that over looks the scenic Spicket River.

Chicago, IL
Client: Broder
Architect: Pappageorge Haymes Partners
Contractor: Macon Construction
Completion Date: 2019
Scope: Doug Tierney served as Owner’s Representative during the new construction of 41 units of luxury residences in Chicago’s Lincoln Park neighborhood. Building amenities include a fitness center, business center, guest suite for out-of-town visitors, private roof decks, swimming pool, underground garage, patios with fire pits and large format chess board, bike storage and repair areas, and a dog spa.

Chicago, IL
Client: Broder
Architect: Pappageorge Haymes Partners
Contractor: Macon Construction
Completion Date: 2019
Scope: Doug Tierney served as Owner’s Representative during the new construction of 24 luxury condominiums in Chicago’s Lincoln Park neighborhood. Building amenities include a fitness center, business center, private roof decks, swimming pool, underground garage, patios with fire pits and large format chess board, bike storage and repair areas, and a dog spa.

Mattapan, MA
Client: Lena New Boston
Architect: Davis Square Architects
Contractor: NEI
Completion Date: Summer 2024
Scope: Olmsted Green consists of 80 new units of homeownership at the site of the former Boston State Hospital in Mattapan. The project is the fourth phase of a five phase project and is expected to start in late 2022. TDS is providing owner’s project management and Clerk-of-the-Works services.

Cambridge, MA
Client: Just-A-Start Corporation
Architect: ICON Architecture
Contractor: Dellbrook | JKS
Completion Date: Spring 2024
Scope: The sea of underutilized parking lots surrounding Rindge Towers on Alewife Brook Parkway is helping alleviate the city’s affordable housing shortage. The PHIUS-certified building went into construction in late 2021 and includes three and half levels of community space, commercial offices, pre-kindergarten classrooms, and two and a half levels of housing. The project solved complex circulation, technology, and acoustic challenges while incorporating multiple uses into a harmonious building. A subsequent phase will create an eight-story building at the southwest corner of the site. Both buildings must be constructed within tight footprints while maintaining the Owner’s ongoing operations at the adjacent Rindge Towers.

Salem, MA
Client: Preservation of Affordable Housing (POAH)
Architect: ICON Architecture
Contractor: Delphi Construction
Completion Date: End of 2022
Scope: The renovations to Salem Heights will replace 12+ stories of unrelieved and failing exterior brick masonry with a new high-performance envelope, along with selective interior upgrades across the 281 units. All units will receive innovative, state-of-the-art, and highly efficient heat pump systems. The project is being done in occupied phases, with on-site tenant relocation. SeanRamos is serving as the Clerk-of-the-Works.

Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: Responding to the increasing demand for high quality independent senior living with integrated support services, Hebrew Senior Life will be adding another wing to its Simon C Fireman Community. The wing will add 45 new units to the original 160 and will be Passive House certified. TDS is acting as the Owner’s Representative, and Peter Rex is serving as Clerk-of-the-Works.

Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: South Coast Improvements
Completion Date: Early 2022
Scope: The 160-unit Simon C Fireman Community is undergoing a transformation to provide residents with a host of new finishes, new bathrooms, windows, flooring, lighting, paint, and electrical load centers. Ten units will be reconfigured for seniors with disabilities. The building must also consider a proposed addition and exterior improvements while designing and implementing the current improvements. TDS is acting as the Owner’s Representative, and Peter Rex is serving as Clerk-of-the-Works.

Cambridge, MA
Client: Just-A-Start Corporation
Architect: Davis Square Architects, Inc.
Contractor: Callahan Construction
Completion Date: October 2021
Scope: Almost every imaginable construction type comprised the 13 buildings in Squirrelwood Apartments: new construction, scattered site rehab, a substantial addition to an existing building, historic renovations, Passive House certification, nine phased relocations, and one occupied rehab that needed to be reconfigured mid-project to phased relocation due to COVID-19. The 14-unit Passive House building has the distinction of being measured in 2021 as the 4th tightest building in the United States!

Lawrence, Jamaica Plain, Dorchester, MA
Client: Heading Home, Inc.
Architect: Studio G
Contractor: Sordan and Cornerstone
Completion Date: Fall 2025
Scope: Scope: Heading Home’s mission is to end homelessness in the Greater Boston area, and TDS is supporting their efforts to improve conditions in four of their shelters located in Lawrence (pictured), Jamaica Plain, and Dorchester. HVAC, envelope, and weatherization improvements, as well as life safety and accessibility upgrades, are included in the scope. We are assisting them with architect and general contractor procurement and helping them navigate direct bidding to subs where appropriate. We also are taking advantage of free energy upgrades provided by the LEAN Multifamily Program. Three of our project managers are carefully orchestrating this work occurring at scattered, occupied sites.

Boston, MA
Client: Codman Square NDC
Architect: Sorensen Partners
Contractor: Groom Construction Co., Inc
Completion Date: 2024
Scope: TDS joined the project team seven months into construction to assist the team with adjustments to a large number of unforeseen conditions, scope modifications, and schedule recovery.

Westminster, MA
Client: Commonwealth Community Developers
Architect: Winslow Architects, Inc
Contractor: Delphi Construction
Completion Date: Early 2025
Scope: TDS is providing plan review, pre-construction, and project management services for Westminster Apartments. When complete, the project will provide 40 new senior units adjacent to the Westminster senior center. In addition to numerous amenity spaces for seniors, the development includes both a gym and a long walking trail around the forested grounds. This 100% electric project will utilize heat pumps for both space heating and domestic hot water, and a large solar array feeding both systems.

Somerville, MA
Client: Somerville Community Corporation
Architect: Joy St. Design
Contractor: South Coast Improvement Co.
Completion Date: TBD
Scope: TDS is continuing its work with SCC on the historic 33 Bow Street and newer 34 Linden Street. Bow Street requires extensive envelope improvements including air sealing and insulation, as well as repair to interior units and common areas. The seven Linden Street buildings require interior upgrades as well as site accessibility improvements. Peter Rex is providing Owner’s Project Management services, including architect and contractor selection, scope development, and sustainability consulting.

Lynn, MA
Client: Lynn Shelter Association
Architect: Jones Architecture
Contractor: Landmark Structures and JMS Masonry & Restoration
Completion Date: TBD
Scope: Rising on the site of the Historic Osmund Hotel, The new Lynn Shelter will help individuals transition to permanent housing through its services and programming. TDS is providing pre-construction services including document review and contractor selection. Eli Herman is serving as Owner’s Project Manager during the renovation of the basement and ground floor of LSA’s property to create a lobby, common areas, dormitories, kitchen, dining space, restrooms, laundry room, and an accessible entrance. The scope also includes full repointing and restoration of the façade and will be financed by of historic tax credits.

Arlington, MA
Client: Housing Corporation of Arlington
Architect: Reframe Systems
Contractor: Reframe Systems
Completion Date: Late 2024
Scope: “One for the books!” as they say. As one of the first Accessory Dwelling Units (ADU’s) to be constructed in Arlington, MA, this prototype two-bedroom module not only employed robotic technology and solar panels, it achieved Passive House (PHIUS) energy efficiency certification! Founded on helical piles, when one of the piles sank, the module was easily lifted, the pile screwed deeper, and the module replaced.TDS closely monitored the modules before, during, and after delivery, examining the air barrier integrity and PHIUS procedures with an eye toward long-term maintainability.

Brookline, MA
Client: Hebrew SeniorLife
Architect: ICON Architecture
Contractor: NEI General Contracting
Completion Date: Late 2024
Scope: In our third project with Hebrew SeniorLife, TDS provided pre-construction services and Owner’s Project Management on a new high rise foeniors. The building has received pre-certification from the Passive House Institute, and the team will be pursuing full certification upon completion.

New Bedford, MA
Client: New Bedford Development Corporation,
E3 Development LLC
Architect: Stantec
Contractor: DF Pray
Scope: The mixed-use re-development at 117 Union Street combines historic preservation, new construction, and ground floor retail. When complete, the project will provide 45 new units of workforce housing to downtown New Bedford.

Dorchester, MA
Client: Heading Home
Architect: Studio G Architects
Contractor: Bald Hill Builders
Completion Date: 2025
Scope: TDS served asOwner’s Project Manager for the construction of a new, four-story residentialbuilding containing 20 rental units for permanent supportive housing forHeading Home, who serves nearly 1,500 homeless and formerly homeless people inthe greater Boston area. The high-performance building envelope andall-electric HVAC are designed to Passive House and LEED Silver standards.Image credit Studio G.

Everett, MA
Client: Impact Residential Development
Architect: The Architectural Team (TAT)
Contractor: Callahan Construction
Completion Date: June 2027
The 25 Garvey Street development converts aformer industrial parcel into a contemporary 125-unit residential complex withmodern amenities and community spaces. As Owner’s Project Manager, TDS is steeringthe project from early design through construction - maintaining alignment amongcost, scope, and quality. TDS led the owner through value engineering and procurementstrategy, recommending a lump-sum contract approach to provide greater costcertainty and control. Close attention to geotechnical and environmentalstudies, along with early risk identification, have been essential tomaintaining progress on this complex site. TDS’ consistent on-site presencesupplements the in-house capacity of this remote ownership team. Image creditTAT.

Somerville, MA
Client: Somerville Homeless Coalition
Architect: The Narrow Gate/ Joy Squared
Contractor: Velney Construction & Citywide Contracting
Completion Date: 2024
Scope: TDS served as Owner’s Project Managerfor SHC during the renovation of the ground floor of First Church Somerville toconvert it to an overnight shelter with 26 beds. The work included installingheat pumps and an ERV, building a new toilet and shower room, and trenching toimprove plumbing, all while allowing church programming to continueuninterrupted on the upper level. This project involved complex change-of-useand code demands, and we guided SHC through cost-effective means of meeting thecity’s requirements in a space housing an active church community.

Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: South Coast Improvements
Completion Date: Early 2022
Scope: The 160-unit Simon C Fireman Community is undergoing a transformation to provide residents with a host of new finishes, new bathrooms, windows, flooring, lighting, paint, and electrical load centers. Ten units will be reconfigured for seniors with disabilities. The building must also consider a proposed addition and exterior improvements while designing and implementing the current improvements. TDS is acting as the Owner’s Representative, and Peter Rex is serving as Clerk-of-the-Works.

Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: Responding to the increasing demand for high quality independent senior living with integrated support services, Hebrew Senior Life will be adding another wing to its Simon C Fireman Community. The wing will add 45 new units to the original 160 and will be Passive House certified. TDS is acting as the Owner’s Representative, and Peter Rex is serving as Clerk-of-the-Works.

Brookline, MA
Client: Hebrew SeniorLife
Architect: ICON Architecture
Contractor: NEI General Contracting
Completion Date: Late 2024
Scope: In our third project with Hebrew SeniorLife, TDS provided pre-construction services and Owner’s Project Management on a new high rise foeniors. The building has received pre-certification from the Passive House Institute, and the team will be pursuing full certification upon completion.

Westminster, MA
Client: Commonwealth Community Developers
Architect: Winslow Architects, Inc
Contractor: Delphi Construction
Completion Date: Early 2025
Scope: TDS is providing plan review, pre-construction, and project management services for Westminster Apartments. When complete, the project will provide 40 new senior units adjacent to the Westminster senior center. In addition to numerous amenity spaces for seniors, the development includes both a gym and a long walking trail around the forested grounds. This 100% electric project will utilize heat pumps for both space heating and domestic hot water, and a large solar array feeding both systems.

Cambridge, MA
Client: Just-A-Start Corporation
Architect: ICON Architecture
Contractor: Dellbrook | JKS
Completion Date: Spring 2024
Scope: The sea of underutilized parking lots surrounding Rindge Towers on Alewife Brook Parkway is helping alleviate the city’s affordable housing shortage. The PHIUS-certified building went into construction in late 2021 and includes three and half levels of community space, commercial offices, pre-kindergarten classrooms, and two and a half levels of housing. The project solved complex circulation, technology, and acoustic challenges while incorporating multiple uses into a harmonious building. A subsequent phase will create an eight-story building at the southwest corner of the site. Both buildings must be constructed within tight footprints while maintaining the Owner’s ongoing operations at the adjacent Rindge Towers.

Roxbury, MA
Client: Children’s Services of Roxbury
Architect: Mass Design Group
Contractor: Janey Construction Management
Completion Date: TBD
Scope: The Children’s Services of Roxbury’s mission is to bring peace of mind to vulnerable children and families across Massachusetts. The project team is helping expand the reach of this mission by assisting CSR in increasing the size of their corporate headquarters. The project scope involves the creative joining of two existing buildings with a glass atrium. TDS is providing pre-construction services.

Cambridge, MA
Client: Homeowners Rehab Inc. (HRI)
Architect: ICON Architecture
Contractor: NEI General Contracting
Completion Date: End of 2026
4 Mellen Street restores a prominent, nationally-registered historic building that once served as the Lesley University admissions building and originally as the 1860’s home of a Cambridge mayor. A six-story Passive House addition creates 29 new affordable homes on a difficult, tight site. As OPM and Clerk of the Works, TDS personnel completed a detailed drawing review to identify issues early so the design team could resolve them before construction. When structural problems were uncovered in the existing foundation, TDS closely managed the budget and all change orders, helping the team balance the Cambridge Historical Commission’s preservation requirements with modern energy performance goals. TDS also oversaw the air sealing and insulation work to ensure the project met both Enterprise Green Communities and Passive House standards.

Cambridge, MA
Client: Just-A-Start Corporation
Architect: Davis Square Architects, Inc.
Contractor: Callahan Construction
Completion Date: October 2021
Scope: Almost every imaginable construction type comprised the 13 buildings in Squirrelwood Apartments: new construction, scattered site rehab, a substantial addition to an existing building, historic renovations, Passive House certification, nine phased relocations, and one occupied rehab that needed to be reconfigured mid-project to phased relocation due to COVID-19. The 14-unit Passive House building has the distinction of being measured in 2021 as the 4th tightest building in the United States!

Revere, MA
Client: The Neighborhood Developers (TND)
Architect: MASS Design
Contractor: Bald Hill Builders
Completion Date: TBD
Scope: Innovative Mass Timber Glu-Lam and CLT construction gave our client an extra floor of beachfront affordable living units within zoning limits, compressed construction time by several weeks, allowed stairs to be accessible without waiting for framing, eliminated wet slab construction, and housed the new residents in warm, quiet, and sustainable homes. TDS provided OPM services on this Passive House project from initial design through construction.

Cambridge, MA
Client: Just-A-Start Corporation
Architect: RODE Architects, Inc
Contractor: Callahan Construction Managers
Completion Date: 2026
Scope: TDS is the Owner’s Representative for this mixed-use, 107-unit, Passive House certified new Smart Growth development in Cambridge, MA. New Street is one of the first projects to be planned under the City’s new Affordable Housing Overlay (AHO) Zoning District, designed to help affordable housing developers create new, permanently affordable homes more quickly, more cost effectively, and in areas of the city where there are currently fewer affordable housing opportunities. The AHO allows the creation of new, permanently affordable housing that is denser than what might be allowed under base zoning and creates a new review process through which new affordable housing can be approved more efficiently.

Cambridge, MA
Client: Just-A-Start Corporation
Architect: ICON Architecture
Contractor: Dellbrook | JKS
Completion Date: Spring 2024
Scope: The sea of underutilized parking lots surrounding Rindge Towers on Alewife Brook Parkway is helping alleviate the city’s affordable housing shortage. The PHIUS-certified building went into construction in late 2021 and includes three and half levels of community space, commercial offices, pre-kindergarten classrooms, and two and a half levels of housing. The project solved complex circulation, technology, and acoustic challenges while incorporating multiple uses into a harmonious building. A subsequent phase will create an eight-story building at the southwest corner of the site. Both buildings must be constructed within tight footprints while maintaining the Owner’s ongoing operations at the adjacent Rindge Towers.

Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: Responding to the increasing demand for high quality independent senior living with integrated support services, Hebrew Senior Life will be adding another wing to its Simon C Fireman Community. The wing will add 45 new units to the original 160 and will be Passive House certified. TDS is acting as the Owner’s Representative, and Peter Rex is serving as Clerk-of-the-Works.

Salem, MA
Client: Preservation of Affordable Housing (POAH)
Architect: ICON Architecture
Contractor: Delphi Construction
Completion Date: End of 2022
Scope: The renovations to Salem Heights will replace 12+ stories of unrelieved and failing exterior brick masonry with a new high-performance envelope, along with selective interior upgrades across the 281 units. All units will receive innovative, state-of-the-art, and highly efficient heat pump systems. The project is being done in occupied phases, with on-site tenant relocation. SeanRamos is serving as the Clerk-of-the-Works.

Pelham, MA
Client: Home City Development
Architect: Architecture EL
Contractor: Western Builders Inc
Completion Date: TBD
Scope: The Amethyst Brook Apartments consist of a new 28 unit Passive House building at the site of the former Montague Fly Rod Factory, and a new 6 unit building with historic detailing to match the character of the larger site. The complex project involves significant retaining walls, wetland adjacencies, ledge, and significant elevation changes. TDS is providing pre-construction services, including design reviews and value engineering.

Somerville, MA
Client: E3 Development LLC
Architect: Placetailor
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: TDS is providing E3 Development with Owner’s Project Management andClerk-of-the-Works services for the new construction of a 16-unit midrise building in Somerville. The building, designed by Placetail will be PassiveHouse Certified, and a leader in the field of energy efficiency. TDS helped the Owner and Contractor overcome last minute budget issues during times of extreme price volatility in the spring of 2022by value engineering the design and developingcreative risk-share provisions in the contract.

Brookline, MA
Client: Hebrew SeniorLife
Architect: ICON Architecture
Contractor: NEI General Contracting
Completion Date: Late 2024
Scope: In our third project with Hebrew SeniorLife, TDS provided pre-construction services and Owner’s Project Management on a new high rise foeniors. The building has received pre-certification from the Passive House Institute, and the team will be pursuing full certification upon completion.
Hudson, MA
Client: Metro West Collaborative Development
Architect: Davis Square Architects
Contractor: L.D. Russo
Completion Date: 2025
Scope: TDS is working with Metro West Collaborative Development to create 40 new units of affordable housing in Hudson, Massachusetts. This 100% electric project will utilize heat pumps for both space heating and domestic hot water, and will achieve Passive House certification once complete. TDS is providing both pre-construction services and Owner's Project Management services through the completion of this project.

Somerville, MA
Client: Somerville Community Corporation
Architect: Joy St. Design
Contractor: South Coast Improvement Co.
Completion Date: TBD
Scope: TDS is continuing its work with SCC on the historic 33 Bow Street and newer 34 Linden Street. Bow Street requires extensive envelope improvements including air sealing and insulation, as well as repair to interior units and common areas. The seven Linden Street buildings require interior upgrades as well as site accessibility improvements. Peter Rex is providing Owner’s Project Management services, including architect and contractor selection, scope development, and sustainability consulting.

Boston, MA
Client: Allston Brighton CDC
Architect: Onion Flats Architects
Contractor: Haycon Building Corp.
CompletionDate: May 2025
Scope: On our first wood fiber insulation project, we achieved significant savings by combining early plan review and value engineering with careful management of change orders related to unanticipated structural repairs in this 120-year-old building. The resulting contingency fund surplus was applied toward construction of a high-performance, Passive House exterior envelope and hyper-efficient HVAC systems -reducing energy consumption per square foot to 69% of conventional code construction. All 20 affordable units will enjoy enhanced comfort and low utility bills while knowing they have significantly reduced carbon emissions.

Cambridge, MA
Client: Homeowners Rehab Inc. (HRI)
Architect: ICON Architecture
Contractor: NEI General Contracting
Completion Date: End of 2026
4 Mellen Street restores a prominent, nationally-registered historic building that once served as the Lesley University admissions building and originally as the 1860’s home of a Cambridge mayor. A six-story Passive House addition creates 29 new affordable homes on a difficult, tight site. As OPM and Clerk of the Works, TDS personnel completed a detailed drawing review to identify issues early so the design team could resolve them before construction. When structural problems were uncovered in the existing foundation, TDS closely managed the budget and all change orders, helping the team balance the Cambridge Historical Commission’s preservation requirements with modern energy performance goals. TDS also oversaw the air sealing and insulation work to ensure the project met both Enterprise Green Communities and Passive House standards.

Boston, MA
Client:Omni Hotels and Resorts
Architect:C+TC Design Studio
Contractor:Shawmut Design and Construction
CompletionDate: Summer 2025
Scope: In the heart of Boston, historic Omni Parker House is the longest continuously operating hotel in the United States. Host to such famous guests as Ulysses S. Grant, Charles Dickens, Babe Ruth, and Yo-Yo Ma, the landmark’s charm androle in American politics made it JFK’s choice for his proposal to JackieBouvier. The luxury hotel and resort chain chose TDS for independent Clerk-of-the-Works services on their revitalization of all 551 guest suites, meeting and function rooms, renowned Rooftop Ballroom, and vibrant lobby. Elevators available to construction teams were undersized, and all sheet goods had to be cut down or craned to be delivered to upper floors. TDS helped the project meet complex scheduling demands while maintaining life safety precautions and allowing the hotel to remain operational throughout construction.

New Bedford, MA
Client: New Bedford Development Corporation,
E3 Development LLC
Architect: Stantec
Contractor: DF Pray
Scope: The mixed-use re-development at 117 Union Street combines historic preservation, new construction, and ground floor retail. When complete, the project will provide 45 new units of workforce housing to downtown New Bedford.

Methuen, MA
Client: Standard Communities
Architect: Union Studio
Contractor: Iron Fish Construction
Completion Date: 2023
Scope: TDS is providing plan review, pre-construction, and project management services for the common area upgrades to Mill Falls Apartments. The project includes replacement of all common area finishes, and a reconfiguration of the ground floor lobby, mail room, and management office spaces. In addition, the scope includes installation of new exterior lighting along the façade that over looks the scenic Spicket River.

Cambridge, MA
Client: Just-A-Start Corporation
Architect: Davis Square Architects, Inc.
Contractor: Callahan Construction
Completion Date: October 2021
Scope: Almost every imaginable construction type comprised the 13 buildings in Squirrelwood Apartments: new construction, scattered site rehab, a substantial addition to an existing building, historic renovations, Passive House certification, nine phased relocations, and one occupied rehab that needed to be reconfigured mid-project to phased relocation due to COVID-19. The 14-unit Passive House building has the distinction of being measured in 2021 as the 4th tightest building in the United States!

Somerville, MA
Client: Somerville Community Corporation
Architect: Joy St. Design
Contractor: South Coast Improvement Co.
Completion Date: TBD
Scope: TDS is continuing its work with SCC on the historic 33 Bow Street and newer 34 Linden Street. Bow Street requires extensive envelope improvements including air sealing and insulation, as well as repair to interior units and common areas. The seven Linden Street buildings require interior upgrades as well as site accessibility improvements. Peter Rex is providing Owner’s Project Management services, including architect and contractor selection, scope development, and sustainability consulting.

Lynn, MA
Client: Lynn Shelter Association
Architect: Jones Architecture
Contractor: Landmark Structures and JMS Masonry & Restoration
Completion Date: TBD
Scope: Rising on the site of the Historic Osmund Hotel, The new Lynn Shelter will help individuals transition to permanent housing through its services and programming. TDS is providing pre-construction services including document review and contractor selection. Eli Herman is serving as Owner’s Project Manager during the renovation of the basement and ground floor of LSA’s property to create a lobby, common areas, dormitories, kitchen, dining space, restrooms, laundry room, and an accessible entrance. The scope also includes full repointing and restoration of the façade and will be financed by of historic tax credits.

Lawrence, Jamaica Plain, Dorchester, MA
Client: Heading Home, Inc.
Architect: Studio G
Contractor: Sordan and Cornerstone
Completion Date: Fall 2025
Scope: Scope: Heading Home’s mission is to end homelessness in the Greater Boston area, and TDS is supporting their efforts to improve conditions in four of their shelters located in Lawrence (pictured), Jamaica Plain, and Dorchester. HVAC, envelope, and weatherization improvements, as well as life safety and accessibility upgrades, are included in the scope. We are assisting them with architect and general contractor procurement and helping them navigate direct bidding to subs where appropriate. We also are taking advantage of free energy upgrades provided by the LEAN Multifamily Program. Three of our project managers are carefully orchestrating this work occurring at scattered, occupied sites.

Westbrook, ME
Client: QuakerLane Associates
Architect: SimonsArchitects/ Lever
Contractor: ZachauConstruction
Completion Date: Late2027
Scope: Every development project begins with a vision, and on this Mass Timber project at Dana Street, our role has been to transform that vision into reality. Early on, the owner needed clarity: Could the design they loved truly fit within their budget and schedule? To answer that, we paired them with a general contractor experienced in providing real-time insight on construction costs and schedules. We also introduced the owner and contractor to Blueprint Robotics, a leader in panelized construction and Mass Timber systems, crafting solutions to control costs without compromising the sophistication needed to succeed in Boston’s competitive real estate market. By rethinking traditional methods and leveraging modular building solutions, the project now benefits from significant time and cost savings without sacrificing design quality.

Revere, MA
Client: The Neighborhood Developers (TND)
Architect: MASS Design
Contractor: Bald Hill Builders
Completion Date: TBD
Scope: Innovative Mass Timber Glu-Lam and CLT construction gave our client an extra floor of beachfront affordable living units within zoning limits, compressed construction time by several weeks, allowed stairs to be accessible without waiting for framing, eliminated wet slab construction, and housed the new residents in warm, quiet, and sustainable homes. TDS provided OPM services on this Passive House project from initial design through construction.

Somerville, MA
Client: Preservation of Affordable Housing (POAH)
Architect: ICON Architecture
Contractor: Dellbrook /JKS, Lab 9
Completion Date: 2025
Scope: The redevelopment of Clarendon Hill apartments involves the demolition of three buildings of dilapidated 1940’s housing stock and the new construction of an168-unit modular housing complex.

Arlington, MA
Client: Housing Corporation of Arlington
Architect: Reframe Systems
Contractor: Reframe Systems
Completion Date: Late 2024
Scope: “One for the books!” as they say. As one of the first Accessory Dwelling Units (ADU’s) to be constructed in Arlington, MA, this prototype two-bedroom module not only employed robotic technology and solar panels, it achieved Passive House (PHIUS) energy efficiency certification! Founded on helical piles, when one of the piles sank, the module was easily lifted, the pile screwed deeper, and the module replaced.TDS closely monitored the modules before, during, and after delivery, examining the air barrier integrity and PHIUS procedures with an eye toward long-term maintainability.
Just getting started or mid-project, we’re here to help.