We believe a complex project can become simple with the right team focused on a common goal. While we prefer to solve your problems before they occur, we can add value at any point in the real estate development cycle.
Coming Soon
Client:
Architect:
Contractor:
Completion Date:
Scope: Coming Soon
Brookline, MA
Client: Hebrew SeniorLife
Architect: ICON Architecture
Contractor: NEI General Contracting
Completion Date: Late 2024
Scope: In our third project with Hebrew SeniorLife, TDS provided pre-construction services and Owner’s Project Management on a new high rise forseniors. The building has received pre-certification from the Passive House Institute, and the team will be pursuing full certification upon completion.
New Bedford, MA
Client: New Bedford Development Corporation,
E3 Development LLC
Architect: Stantec
Contractor: DF Pray
Scope: The mixed-use re-development at 117 Union Street combines historic preservation, new construction, and ground floor retail. When complete, the project will provide 45 new units of workforce housing to downtown New Bedford.
Boston, MA
Client: Back of the Hill CDC
Architect: Mix Design and Development LLC
Contractor: Various
Completion Date: Summer 2022
Scope: TDS is assisting Back of the Hill CDC in the execution of a new model of affordable homeownership development. Instead of relying on state and federal subsidies to create this affordability, BOTH CDC is exploring a direct connection to sellers, allowing them to capture the tax incentives of selling to BOTH CDC at below market prices. BOTH CDC then packages these acquisitions savings with a renovation geared to affordability and passes those savings onto new homeowners. TDS helped develop the proforma, retained all third-party consultants, and helped the Owner act as its own general contractor, directly hiring all subcontractors.
Somerville, MA
Client: E3 Development LLC
Architect: Placetailor
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: TDS is providing E3 Development with Owner’s Project Management andClerk-of-the-Works services for the new construction of a 16-unit midrise building in Somerville. The building, designed by Placetailer, will be PassiveHouse Certified, and a leader in the field of energy efficiency. TDS helped the Owner and Contractor overcome last minute budget issues during times of extreme price volatility in the spring of 2022by value engineering the design and developingcreative risk-share provisions in the contract.
Chicago, IL
Client: Broder
Architect: Pappageorge Haymes Partners
Contractor: Macon Construction
Completion Date: 2019
Scope: Doug Tierney served as Owner’s Representative during the new construction of 53units of luxury residences in Chicago’s Lincoln Park and Lake view neighborhoods. Building amenities include a fitness center, a spectacular roof deck with views of downtown Chicago, bike storage and repair areas, and a dog spa.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: RODE Architects, Inc
Contractor: Callahan Construction Managers
Scope: TDS is the Owner’s Representative for this mixed-use, 107-unit, Passive House certified new Smart Growth development in Cambridge, MA. New Street is one of the first projects to be planned under the City’s new Affordable Housing Overlay (AHO) Zoning District, designed to help affordable housing developers create new, permanently affordable homes more quickly, more cost effectively, and in areas of the city where there are currently fewer affordable housing opportunities. The AHO allows the creation of new, permanently affordable housing that is denser than what might be allowed under base zoning and creates a new review process through which new affordable housing can be approved more efficiently.
Boston, MA
Client: Allston Brighton CDC
Architect: Narrow Gate
Contractor: Bald Hill Builders
Completion Date: TBD
Scope: TDS is providing Clerk-of-the-Works services for the renovation ofunits of housing.
Hudson, MA
Client: Metro West Collaborative Development
Architect: Davis SquareArchitects
Contractor: TBD
Scope: TDS is working with Metro West Collaborative Development to create 40 new units of affordable housing in Hudson, Massachusetts. This 100% electric project will utilize heat pumps for both space heating, and domestic hot water, and will achieve Passive House certification once complete.
Pelham, MA
Client: Home City Development
Architect: Architecture EL
Contractor: Western Builder’s Inc
Completion Date: TBD
Scope: The Amethyst Brook Apartments consist of a new 28 unit Passive House building at the site of the former Montague Fly Rod Factory, and a new 6 unit building with historic detailing to match the character of the larger site. The complex project involves significant retaining walls, wetland adjacencies, ledge, and significant elevation changes. TDS is providing pre-construction services, including design reviews and value engineering.
Randolph, MA
Client: Preservation of Affordable Housing
Architect: ICON Architecture
Contractor: South Coast Improvement Company
Scope: TDS is providing refinancing scope and pricing review as well as construction oversight for occupied UFAS upgrades. This includes upgrades for site accessibility, sustainability goals, elective electrical infrastructure, and previously deferred repairs to these three buildings, each consisting of three residential stories totaling 104 units which border the Bear Swamp Conservation Area.
Beverly, Danvers, Peabody & Salem, MA
Client: Preservation of Affordable Housing
Architect: ICON Architecture
Contractor: South Coast Improvement Company
Scope: TDS is providing refinancing scope and pricing review as well as construction oversight for occupied UFAS upgrades. This includes upgrades for site accessibility, sustainability goals, elective electrical infrastructure, and previously deferred repairs to these five to six story buildings located on four separate sites totaling 321 units constructed in the late 60s
Somerville, MA
Client: Preservation of Affordable Housing (POAH)
Architect: ICON Architecture
Contractor: Dellbrook /JKS
Completion Date: TBD
Scope: The redevelopment of Clarendon Hill apartments involves the demolition of three buildings of dilapidated 1940’s housing stock and the new construction of an168 unit modular housing complex.
Fitchburg, MA
Client: NewVue Communities
Architect: Resolution Architects
Contractor: EliteC onstruction
Completion Date: Late 2022
Scope: The Cleghorn Modernization is the renovation of three buildings in the Cleghorn Neighborhood of Fitchburg. TDS provided Clerk of the Works services for one of the three buildings, which consisted of 9-unit renovation and a 2-unit addition.
Arlington, MA
Client: Housing Corporation of Arlington
Architect: Davis SquareArchitects, Inc.
Contractor: Delphi Construction
Completion Date: December 2021
Scope: The two Downing Square / Broadway Initiative projects are composed of three new low-and mid-rise buildings on challenging sites in Arlington, Massachusetts. The wood framed buildings all meet the new Stretch Energy Code, with detailed air sealing, compartmentalization between units, and continuous exterior insulation. The ground floor of the mixed-use Broadway project will be the new home of the Arlington Eats Market.
Beverly, Danvers, Peabody & Salem, MA
Client: Preservation of Affordable Housing
Architect: ICON Architecture
Contractor: South Coast Improvement Company
Scope: TDS is providing refinancing scope and pricing review as well as construction oversight for occupied UFAS upgrades. This includes upgrades for site accessibility, sustainability goals, elective electrical infrastructure, and previously deferred repairs to these five to six story buildings located on four separate sites totaling 321 units constructed in the late 60s
Springfield, MA
Client: Home City Development
Architect: Architecture EL
Scope: TDS is providing design reviews and pre-construction assistance for the new construction of 40 units of homeownership at a former industrial site in Springfield. The project team has been working to find the most economical way to overcome complex geotechnical and environmental constraints, while still delivering ultra-high performance energy efficient construction.
Mashpee, MA
Client: Preservation of Affordable Housing (POAH)
Architect: Dream Collaborative
Contractor: Delphi
Completion Date: Summer 2024
Scope: The construction of LeClaire Village at 950 Falmouth Road in Mashpee will provide39 new units of critical affordable housing to Cape Cod. TDS’ John Cavacas is providing both Owner’s Project Management and Clerk-of-the-Works services.
Methuen, MA
Client: Standard Communities
Architect: Union Studio
Contractor: Iron Fish Construction
Completion Date: 2023
Scope: TDS is providing plan review, pre-construction, and project management services for the common area upgrades to Mill Falls Apartments. The project includes replacement of all common area finishes, and a reconfiguration of the ground floor lobby, mail room, and management office spaces. In addition, the scope includes installation of new exterior lighting along the façade that over looks the scenic Spicket River.
Chicago, IL
Client: Broder
Architect: Pappageorge Haymes Partners
Contractor: Macon Construction
Completion Date: 2019
Scope: Doug Tierney served as Owner’s Representative during the new construction of 41units of luxury residences in Chicago’s Lincoln Park neighborhood. Building amenities include a fitness center, business center, guest suite for out-of-town visitors, private roof decks, swimming pool, underground garage, patios with fire pits and large format chess board, bike storage and repair areas, and a dog spa.
Chicago, IL
Client: Broder
Architect: Pappageorge Haymes Partners
Contractor: Macon Construction
Completion Date: 2019
Scope: Doug Tierney served as Owner’s Representative during the new construction of 24luxury condominiums in Chicago’s Lincoln Park neighborhood. Building amenities include a fitness center, business center, private roof decks, swimming pool, underground garage, patios with fire pits and large format chess board, bike storage and repair areas, and a dog spa.
Boston, MA
Client: Lena New Boston
Architect: Davis Square Architects
Contractor: NEI
Completion Date: Summer 2024
Scope: Olmsted Green consists of 80 new units of homeownership at the site of the formerBoston State Hospital in Mattapan. The project is the fourth phase of a five phase project and is expected to start in late 2022. TDS is providing owner’s project management and Clerk-of-the-Works services.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: ICON Architecture
Contractor: Dellbrook | JKS
Completion Date: Winter 2023
Scope: The sea of underutilized parking lots surrounding Rindge Towers off Alewife BrookParkway will soon help alleviate the city’s affordable housing shortage. The first of two PHIUS-certified buildings is expected to go into construction in late2021 and will include three and half levels of community space, commercial offices, and pre-kindergarten programming below two and a half levels of housing. The project must solve complex circulation, access control, acoustic challenges, and mixed construction types to combine all three uses into a harmonious building. Phase 2 will create an eight-story building at the southwest corner of the site. Both buildings must be constructed within tight footprints while maintaining the Owner’s ongoing operations at the Rindge Tower!
Salem, MA
Client: Preservation of Affordable Housing (POAH)
Architect: ICON Architecture
Contractor: Delphi Construction
Completion Date: End of 2022
Scope: The renovations to Salem Heights will replace 12+ stories of unrelieved and failing exterior brick masonry with a new high-performance envelope, along with selective interior upgrades across the 281 units. All units will receive innovative, state-of-the-art, and highly efficient heat pump systems. The project is being done in occupied phases, with on-site tenant relocation. SeanRamos is serving as the Clerk-of-the-Works.
Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: Responding to the increasing demand for high quality independent senior living with integrated support services, Hebrew Senior Life will be adding another wing to its Simon C Fireman Community. The wing will add 45 new units to the original 160 and will be Passive House certified. TDS is acting as the Owner’s Representative, and Peter Rex is serving as Clerk-of-the-Works.
Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: South Coast Improvements
Completion Date: Early 2022
Scope: The 160-unit Simon C Fireman Community is undergoing a transformation to provide residents with a host of new finishes, new bathrooms, windows, flooring, lighting, paint, and electrical load centers. Ten units will be reconfigured for seniors with disabilities. The building must also consider a proposed addition and exterior improvements while designing and implementing the current improvements. TDS is acting as the Owner’s Representative, and Peter Rex is serving asClerk-of-the-Works.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: Davis Square Architects, Inc.
Contractor: Callahan Construction
Completion Date: October 2021
Scope: Almost every imaginable construction type comprised the 13 buildings in Squirrelwood Apartments: new construction, scattered site rehab, a substantial addition to an existing building, historic renovations, Passive House certification, nine phased relocations, and one occupied rehab that needed to be reconfigured mid-project to phased relocation due to COVID-19. The 14-unit Passive House building has the distinction of being measured in 2021 as the 4th tightest building in the United States!
Cambridge, MA
Client:
Scope:
Boston, MA
Client: Codman Square Neighborhood Development Corporation
Architect: Sorensen Partners / Architects + Planners, Inc
Contractor: Groom Construction Co., Inc
Completion Date: TBD
Scope: TDS joined the project team 7 months into construction to assist the team with adjustments to a large number of unforeseen conditions, scope modifications, and schedule recovery.
Westminster, MA
Client: Commonwealth Community Developers
Architect: Winslow Architects, Inc
Contractor: Delphi Construction
Completion Date: Early 2025
Scope: TDS is providing plan review, pre-construction, and project management services for Westminster Apartments. When complete, the project will provide 40 new senior units adjacent to the Westminster senior center. In addition to numerous amenity spaces for seniors, the development includes both a gym and a long walking trail around the forested grounds. This 100% electric project will utilize heat pumps for both space heating and domestic hot water, and a large solar array feeding both systems.
Yarmouth, MA
Client: Commonwealth Community Developers
Architect: Winslow Architects, Inc
Contractor: Delphi Construction
Completion Date: End of 2021
Scope: TDS has provided plan reviews and project management services to the developer of YarmouthGardens, delivering 40 new affordable units on the site of the former YarmouthGardens Motor Lodge. The old motor lodge is making way for two new 2-story buildings featuring contemporary design, competitive amenities, desirable floor plans and high-end designer finishes. The development will offer 40 one-, two-, and three-bedroom affordable apartment rentals in a family-friendly community conveniently located near local shopping, dining, and recreational opportunities. Accessible units are designed to accommodate mobility and/or sensory impairments. TDS employee John Cavacas is serving as Clerk-of-the-Works.
Brookline, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: TBD
Completion Date: Late 2024
Scope: In our third project with Hebrew SeniorLife, TDS provided pre-construction services andOwner’s Project Management on a new high rise foseniors. The building has received pre-certification from the Passive House Institute, and the team will be pursuing full certification upon completion.
Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: South Coast Improvements
Completion Date: Early 2022
Scope: The 160-unit Simon C Fireman Community is undergoing a transformation to provide residents with a host of new finishes, new bathrooms, windows, flooring, lighting, paint, and electrical load centers. Ten units will be reconfigured for seniors with disabilities. The building must also consider a proposed addition and exterior improvements while designing and implementing the current improvements. TDS is acting as the Owner’s Representative, and Peter Rex is serving asClerk-of-the-Works.
Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: Responding to the increasing demand for high quality independent senior living with integrated support services, Hebrew Senior Life will be adding another wing to its Simon C Fireman Community. The wing will add 45 new units to the original 160 and will be Passive House certified. TDS is acting as the Owner’s Representative, and Peter Rex is serving as Clerk-of-the-Works.
Westminster, MA
Client: Commonwealth Community Developers
Architect: Winslow Architects, Inc
Contractor: Delphi Construction
Completion Date: Early 2025
Scope: TDS is providing plan review, pre-construction, and project management services for Westminster Apartments. When complete, the project will provide 40 new senior units adjacent to the Westminster senior center. In addition to numerous amenity spaces for seniors, the development includes both a gym and a long walking trail around the forested grounds. This 100% electric project will utilize heat pumps for both space heating and domestic hot water, and a large solar array feeding both systems.
Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: South Coast Improvements
Completion Date: Early 2022
Scope: The 160-unit SimonC Fireman Community is undergoing a transformation to provide residents with a host of new finishes, new bathrooms, windows, flooring, lighting, paint, and electrical load centers. Ten units will be reconfigured for seniors with disabilities. The building must also consider a proposed addition and exterior improvements while designing and implementing the current improvements. TDS is acting as the Owner’s Representative, and Peter Rex is serving asClerk-of-the-Works.
Chicago, IL
Client: Broder
Architect: Pappageorge Haymes Partners
Contractor: Macon Construction
Completion Date: 2019
Scope: Doug Tierney served as Owner’s Representative during the new construction of 24luxury condominiums in Chicago’s Lincoln Park neighborhood. Building amenities include a fitness center, business center, private roof decks, swimming pool, underground garage, patios with fire pits and large format chess board, bike storage and repair areas, and a dog spa.
Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: Responding to the increasing demand for high quality independent senior living with integrated support services, Hebrew Senior Life will be adding another wing to its Simon C Fireman Community. The wing will add 45 new units to the original 160 and will be Passive House certified. TDS is acting as the Owner’s Representative, and Peter Rex is serving as Clerk-of-the-Works.
Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: Responding to the increasing demand for high quality independent senior living with integrated support services, Hebrew Senior Life will be adding another wing to its Simon C Fireman Community. The wing will add 45 new units to the original 160 and will be Passive House certified. TDS is acting as the Owner’s Representative, and Peter Rex is serving as Clerk-of-the-Works.
Chicago, IL
Client: Broder
Architect: Pappageorge Haymes Partners
Contractor: Macon Construction
Completion Date: 2019
Scope: Doug Tierney served as Owner’s Representative during the new construction of 41units of luxury residences in Chicago’s Lincoln Park neighborhood. Building amenities include a fitness center, business center, guest suite for out-of-town visitors, private roof decks, swimming pool, underground garage, patios with fire pits and large format chess board, bike storage and repair areas, and a dog spa.
Chicago, IL
Client: Broder
Architect: Pappageorge Haymes Partners
Contractor: Macon Construction
Completion Date: 2019
Scope: Doug Tierney served as Owner’s Representative during the new construction of 24luxury condominiums in Chicago’s Lincoln Park neighborhood. Building amenities include a fitness center, business center, private roof decks, swimming pool, underground garage, patios with fire pits and large format chess board, bike storage and repair areas, and a dog spa.
Watertown, MA
Client: Broder
Architect: Various
Contractor: Various
Completion Date: TBD
Scope: TDS is assisting Broder in the renovation of its lab building at 313 Pleasant Street. Scope includes new rooftop HVAC equipment, pH neutralization systems, and lab fit out.
Watertown, MA
Client: Broder
Architect: CBT Architects
Contractor: Suffolk Construction
Completion Date: TBD
Scope: TDS is assisting Broder in the development of an 180,000 square foot lab building, five story freestanding parking garage, and an outdoor pavilion.
Boston, MA
Client: Children’s Services of Roxbury
Architect: Mass Design Group
Contractor: Janey Construction Management
Completion Date: TBD
Scope: The Children’s Services of Roxbury’s mission is to bring peace of mind to vulnerable children and families across Massachusetts. The project team is helping expand the reach of this mission by assisting CSR in increasing the size of their corporate headquarters. The project scope involves the creative joining of two existing buildings with a glass atrium. TDS is providing pre-construction services.
Boston, MA
Client: Paul Lukez Architects
Contractor: TBD
Completion Date: 2024
Scope: In 2024, InterSystems Corp will move into a new corporate headquarters in the top14 floors of the new, state of the art, one-million-square-foot office tower atOne Congress in downtown Boston. TDS is assisting Paul Lukez Architects assemble and manage the design team responsible for delivering on this mission.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: ICON Architecture
Contractor: Dellbrook | JKS
Completion Date: Winter 2023
Scope: The sea of underutilized parking lots surrounding Rindge Towers off Alewife BrookParkway will soon help alleviate the city’s affordable housing shortage. The first of two PHIUS-certified buildings is expected to go into construction in late2021 and will include three and half levels of community space, commercial offices, and pre-kindergarten programming below two and a half levels of housing. The project must solve complex circulation, access control, acoustic challenges, and mixed construction types to combine all three uses into a harmonious building. Phase 2 will create an eight-story building at the southwest corner of the site. Both buildings must be constructed within tight footprints while maintaining the Owner’s ongoing operations at the Rindge Tower!
Watertown, MA
Client: Broder
Architect: Various
Contractor: Various
Completion Date: TBD
Scope: TDS is assisting Broder in the renovation of its lab building at 313 Pleasant Street. Scope includes new rooftop HVAC equipment, pH neutralization systems, and lab fit out.
Watertown, MA
Client: Broder
Architect: CBT Architects
Contractor: Suffolk Construction
Completion Date: TBD
Scope: TDS is assisting Broder in the development of an 180,000 square foot lab building, five story freestanding parking garage, and an outdoor pavilion.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: ICON Architecture
Contractor: Dellbrook | JKS
Completion Date: Winter 2023
Scope: The sea of underutilized parking lots surrounding Rindge Towers off Alewife Brook Parkway will soon help alleviate the city’s affordable housing shortage. The first of two PHIUS-certified buildings is expected to go into construction in late 2021and will include three and half levels of community space, commercial offices, and pre-kindergarten programming below two and a half levels of housing. The project must solve complex circulation, access control, acoustic challenges, and mixed construction types to combine all three uses into a harmonious building. Phase 2 will create an eight-story building at the southwest corner of the site. Both buildings must be constructed within tight footprints while maintaining the Owner’s ongoing operations at the Rindge Tower!
Brookline, MA
Client: Hebrew SeniorLife
Architect: ICON Architecture
Contractor: NEI General Contracting
Completion Date: Late 2024
Scope: In our third project with Hebrew SeniorLife, TDS provided pre-construction services and Owner’s Project Management on a new high rise foseniors. The building has received pre-certification from the Passive House Institute, and the team will be pursuing full certification upon completion.
New Bedford, MA
Client: New Bedford Development Corporation,
E3 Development LLC
Architect: Stantec
Contractor: DF Pray
Scope: The mixed-use re-development at 117 Union Street combines historic preservation, new construction, and ground floor retail. When complete, the project will provide 45 new units of workforce housing to downtown New Bedford.
Somerville, MA
Client: E3 Development LLC
Architect: Placetailor
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: TDS is providing E3 Development with Owner’s Project Management andClerk-of-the-Works services for the new construction of a 16-unit midrise building in Somerville. The building, designed by Placetailer, will be PassiveHouse Certified, and a leader in the field of energy efficiency. TDS helped the Owner and Contractor overcome last minute budget issues during times of extreme price volatility in the spring of 2022by value engineering the design and developing creative risk-share provisions in the contract.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: RODE Architects, Inc
Contractor: Callahan Construction Managers
Scope: TDS is the Owner’s Representative for this mixed-use, 107-unit, Passive House certified new Smart Growth development in Cambridge, MA. New Street is one of the first projects to be planned under the City’s new Affordable Housing Overlay (AHO) Zoning District, designed to help affordable housing developers create new, permanently affordable homes more quickly, more cost effectively, and in areas of the city where there are currently fewer affordable housing opportunities. The AHO allows the creation of new, permanently affordable housing that is denser than what might be allowed under base zoning and creates a new review process through which new affordable housing can be approved more efficiently.
Hudson, MA
Client: Metro West Collaborative Development
Architect: Davis SquareArchitects
Contractor: TBD
Scope: TDS is working with Metro West Collaborative Development to create 40 new units of affordable housing in Hudson, Massachusetts. This 100% electric project will utilize heat pumps for both space heating, and domestic hot water, and will achieve Passive House certification once complete.
Pelham, MA
Client: Home City Development
Architect: Architecture EL
Contractor: Western Builder’s Inc
Completion Date: TBD
Scope: The Amethyst Brook Apartments consist of a new 28 unit Passive House building at the site of the former Montague Fly Rod Factory, and a new 6 unit building with historic detailing to match the character of the larger site. The complex project involves significant retaining walls, wetland adjacencies, ledge, and significant elevation changes. TDS is providing pre-construction services, including design reviews and value engineering.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: ICON Architecture
Contractor: Dellbrook | JKS
Completion Date: Winter 2023
Scope: The sea of underutilized parking lots surrounding Rindge Towers off Alewife BrookParkway will soon help alleviate the city’s affordable housing shortage. The first of two PHIUS-certified buildings is expected to go into construction in late2021 and will include three and half levels of community space, commercial offices, and pre-kindergarten programming below two and a half levels of housing. The project must solve complex circulation, access control, acoustic challenges, and mixed construction types to combine all three uses into a harmonious building. Phase 2 will create an eight-story building at the southwest corner of the site. Both buildings must be constructed within tight footprints while maintaining the Owner’s ongoing operations at the Rindge Tower!
Salem, MA
Client: Preservation of Affordable Housing (POAH)
Architect: ICON Architecture
Contractor: Delphi Construction
Completion Date: End of 2022
Scope: The renovations to Salem Heights will replace 12+ stories of unrelieved and failing exterior brick masonry with a new high-performance envelope, along with selective interior upgrades across the 281 units. All units will receive innovative, state-of-the-art, and highly efficient heat pump systems. The project is being done in occupied phases, with on-site tenant relocation. SeanRamos is serving as the Clerk-of-the-Works.
Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: Responding to the increasing demand for high quality independent senior living with integrated support services, Hebrew Senior Life will be adding another wing to its Simon C Fireman Community. The wing will add 45 new units to the original 160 and will be Passive House certified. TDS is acting as the Owner’s Representative, and Peter Rex is serving as Clerk-of-the-Works.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: Davis Square Architects, Inc.
Contractor: Callahan Construction
Completion Date: October 2021
Scope: Almost every imaginable construction type comprised the 13 buildings in Squirrelwood Apartments: new construction, scattered site rehab, a substantial addition to an existing building, historic renovations, Passive House certification, nine phased relocations, and one occupied rehab that needed to be reconfigured mid-project to phased relocation due to COVID-19. The 14-unit Passive House building has the distinction of being measured in 2021 as the 4th tightest building in the United States!
Westminster, MA
Client: Commonwealth Community Developers
Architect: Winslow Architects, Inc
Contractor: Delphi Construction
Completion Date: Early 2025
Scope: TDS is providing plan review, pre-construction, and project management services for Westminster Apartments. When complete, the project will provide 40 new senior units adjacent to the Westminster senior center. In addition to numerous amenity spaces for seniors, the development includes both a gym and a long walking trail around the forested grounds. This 100% electric project will utilize heat pumps for both space heating and domestic hot water, and a large solar array feeding both systems.
New Bedford, MA
Client: New Bedford Development Corporation,
E3 Development LLC
Architect: Stantec
Contractor: DF Pray
Scope: The mixed-use re-development at 117 Union Street combines historic preservation, new construction, and ground floor retail. When complete, the project will provide 45 new units of workforce housing to downtown New Bedford.
Boston, MA
Client: Back of the Hill CDC
Architect: Mix Design and Development LLC
Contractor: Various
Completion Date: Summer 2022
Scope: TDS is assisting Back of the Hill CDC in the execution of a new model of affordable homeownership development. Instead of relying on state and federal subsidies to create this affordability, BOTH CDC is exploring a direct connection to sellers, allowing them to capture the tax incentives of selling to BOTH CDC at below market prices. BOTH CDC then packages these acquisitions savings with a renovation geared to affordability and passes those savings onto new homeowners. TDS helped develop the proforma, retained all third-party consultants, and helped the Owner act as its own general contractor, directly hiring all subcontractors.
Watertown, MA
Client: Broder
Architect: Various
Contractor: Various
Completion Date: TBD
Scope: TDS is assisting Broder in the renovation of its lab building at 313 Pleasant Street. Scope includes new rooftop HVAC equipment, pH neutralization systems, and lab fit out.
Boston, MA
Client: Allston Brighton CDC
Architect: Narrow Gate
Contractor: Bald Hill Builders
Completion Date: TBD
Scope: TDS is providing Clerk-of-the-Works services for the renovation of 6 units of housing.
Randolph, MA
Client: Preservation of Affordable Housing
Architect: ICON Architecture
Contractor: South Coast Improvement Company
Scope: TDS is providing refinancing scope and pricing review as well as construction oversight for occupied UFAS upgrades. This includes upgrades for site accessibility, sustainability goals, elective electrical infrastructure, and previously deferred repairs to these three buildings, each consisting of three residential stories totaling 104 units which border the Bear Swamp Conservation Area.
Beverly, Danvers, Peabody & Salem, MA
Client: Preservation of Affordable Housing
Architect: ICON Architecture
Contractor: South Coast Improvement Company
Scope: TDS is providing refinancing scope and pricing review as well as construction oversight for occupied UFAS upgrades. This includes upgrades for site accessibility, sustainability goals, elective electrical infrastructure, and previously deferred repairs to these five to six story buildings located on four separate sites totaling 321 units constructed in the late 60s
Various Locations
Client: Community EconomicDevelopment Assistance Corporation (CEDAC)
Architect: Various
Contractor: Various
Completion Date: Ongoing
Scope: TDS is helping homeowners with disabilities remain in their homes by providing oversight to CEDAC’s Home Modification Loan Program, under which homeowners and small landlords can fund accessibility upgrades.
Watertown, MA
Client: Broder
Architect: Various
Contractor: Various
Completion Date: TBD
Scope: TDS is assisting Broder in the renovation of its lab building at 313 Pleasant Street. Scope includes new rooftop HVAC equipment, pH neutralization systems, and lab fit out.
Fitchburg, MA
Client: NewVue Communities
Architect: Resolution Architects
Contractor: EliteC onstruction
Completion Date: Late 2022
Scope: The Cleghorn Modernization is the renovation of three buildings in the Cleghorn Neighborhood of Fitchburg. TDS provided Clerk of the Works services for one of the three buildings, which consisted of 9-unit renovation and a 2-unit addition.
Beverly, Danvers, Peabody & Salem, MA
Client: Preservation of Affordable Housing
Architect: ICON Architecture
Contractor: South Coast Improvement Company
Scope: TDS is providing refinancing scope and pricing review as well as construction oversight for occupied UFAS upgrades. This includes upgrades for site accessibility, sustainability goals, elective electrical infrastructure, and previously deferred repairs to these five to six story buildings located on four separate sites totaling 321 units constructed in the late 60s
Methuen, MA
Client: Standard Communities
Architect: Union Studio
Contractor: Iron Fish Construction
Completion Date: 2023
Scope: TDS is providing plan review, pre-construction, and project management services for the common area upgrades to Mill Falls Apartments. The project includes replacement of all common area finishes, and a reconfiguration of the ground floor lobby, mail room, and management office spaces. In addition, the scope includes installation of new exterior lighting along the façade that over looks the scenic Spicket River.
Salem, MA
Client: Preservation of Affordable Housing (POAH)
Architect: ICON Architecture
Contractor: Delphi Construction
Completion Date: End of 2022
Scope: The renovations to Salem Heights will replace 12+ stories of unrelieved and failing exterior brick masonry with a new high-performance envelope, along with selective interior upgrades across the 281 units. All units will receive innovative, state-of-the-art, and highly efficient heat pump systems. The project is being done in occupied phases, with on-site tenant relocation. SeanRamos is serving as the Clerk-of-the-Works.
Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: South Coast Improvements
Completion Date: Early 2022
Scope: The 160-unit Simon C Fireman Community is undergoing a transformation to provide residents with a host of new finishes, new bathrooms, windows, flooring, lighting, paint, and electrical load centers. Ten units will be reconfigured for seniors with disabilities. The building must also consider a proposed addition and exterior improvements while designing and implementing the current improvements. TDS is acting as the Owner’s Representative, and Peter Rex is serving asClerk-of-the-Works.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: Davis Square Architects, Inc.
Contractor: Callahan Construction
Completion Date: October 2021
Scope: Almost every imaginable construction type comprised the 13 buildings in Squirrelwood Apartments: new construction, scattered site rehab, a substantial addition to an existing building, historic renovations, Passive House certification, nine phased relocations, and one occupied rehab that needed to be reconfigured mid-project to phased relocation due to COVID-19. The 14-unit Passive House building has the distinction of being measured in 2021 as the 4th tightest building in the United States!
Boston, MA
Client: Codman Square Neighborhood Development Corporation
Architect: Sorensen Partners / Architects + Planners, Inc
Contractor: Groom Construction Co., Inc
Completion Date: TBD
Scope: TDS joined the project team 7 months into construction to assist the team with adjustments to a large number of unforeseen conditions, scope modifications, and schedule recovery.
Randolph, MA
Client: Preservation of Affordable Housing
Architect: ICON Architecture
Contractor: South Coast Improvement Company
Scope: TDS is providing refinancing scope and pricing review as well as construction oversight for occupied UFAS upgrades. This includes upgrades for site accessibility, sustainability goals, elective electrical infrastructure, and previously deferred repairs to these three buildings, each consisting of three residential stories totaling 104 units which border the Bear Swamp Conservation Area.
Beverly, Danvers, Peabody & Salem, MA
Client: Preservation of Affordable Housing
Architect: ICON Architecture
Contractor: South Coast Improvement Company
Scope: TDS is providing refinancing scope and pricing review as well as construction oversight for occupied UFAS upgrades. This includes upgrades for site accessibility, sustainability goals, elective electrical infrastructure, and previously deferred repairs to these five to six story buildings located on four separate sites totaling 321 units constructed in the late 60s
Various Locations
Client: Community EconomicDevelopment Assistance Corporation (CEDAC)
Architect: Various
Contractor: Various
Completion Date: Ongoing
Scope: TDS is helping homeowners with disabilities remain in their homes by providing oversight to CEDAC’s Home Modification Loan Program, under which homeowners and small landlords can fund accessibility upgrades.
Beverly, Danvers, Peabody & Salem, MA
Client: Preservation of Affordable Housing
Architect: ICON Architecture
Contractor: South Coast Improvement Company
Scope: TDS is providing refinancing scope and pricing review as well as construction oversight for occupied UFAS upgrades. This includes upgrades for site accessibility, sustainability goals, elective electrical infrastructure, and previously deferred repairs to these five to six story buildings located on four separate sites totaling 321 units constructed in the late 60s
Methuen, MA
Client: Standard Communities
Architect: Union Studio
Contractor: Iron Fish Construction
Completion Date: 2023
Scope: TDS is providing plan review, pre-construction, and project management services for the common area upgrades to Mill Falls Apartments. The project includes replacement of all common area finishes, and a reconfiguration of the ground floor lobby, mail room, and management office spaces. In addition, the scope includes installation of new exterior lighting along the façade that over looks the scenic Spicket River.
Salem, MA
Client: Preservation of Affordable Housing (POAH)
Architect: ICON Architecture
Contractor: Delphi Construction
Completion Date: End of 2022
Scope: The renovations to Salem Heights will replace 12+ stories of unrelieved and failing exterior brick masonry with a new high-performance envelope, along with selective interior upgrades across the 281 units. All units will receive innovative, state-of-the-art, and highly efficient heat pump systems. The project is being done in occupied phases, with on-site tenant relocation. SeanRamos is serving as the Clerk-of-the-Works.
Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: South Coast Improvements
Completion Date: Early 2022
Scope: The 160-unit Simon C Fireman Community is undergoing a transformation to provide residents with a host of new finishes, new bathrooms, windows, flooring, lighting, paint, and electrical load centers. Ten units will be reconfigured for seniors with disabilities. The building must also consider a proposed addition and exterior improvements while designing and implementing the current improvements. TDS is acting as the Owner’s Representative, and Peter Rex is serving asClerk-of-the-Works.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: Davis Square Architects, Inc.
Contractor: Callahan Construction
Completion Date: October 2021
Scope: Almost every imaginable construction type comprised the 13 buildings in Squirrelwood Apartments: new construction, scattered site rehab, a substantial addition to an existing building, historic renovations, Passive House certification, nine phased relocations, and one occupied rehab that needed to be reconfigured mid-project to phased relocation due to COVID-19. The 14-unit Passive House building has the distinction of being measured in 2021 as the 4th tightest building in the United States!
Brookline, MA
Client: Hebrew SeniorLife
Architect: ICON Architecture
Contractor: NEI General Contracting
Completion Date: Late 2024
Scope: In our third project with Hebrew SeniorLife, TDS provided pre-construction services and Owner’s Project Management on a new high rise foeniors. The building has received pre-certification from the Passive House Institute, and the team will be pursuing full certification upon completion.
New Bedford, MA
Client: New Bedford Development Corporation,
E3 Development LLC
Architect: Stantec
Contractor: DF Pray
Scope: The mixed-use re-development at 117 Union Street combines historic preservation, new construction, and ground floor retail. When complete, the project will provide 45 new units of workforce housing to downtown New Bedford.
Somerville, MA
Client: E3 Development LLC
Architect: Placetailor
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: TDS is providing E3 Development with Owner’s Project Management andClerk-of-the-Works services for the new construction of a 16-unit midrise building in Somerville. The building, designed by Placetailer, will be PassiveHouse Certified, and a leader in the field of energy efficiency. TDS helped the Owner and Contractor overcome last minute budget issues during times of extreme price volatility in the spring of 2022by value engineering the design and developing creative risk-share provisions in the contract.
Chicago, IL
Client: Broder
Architect: Pappageorge Haymes Partners
Contractor: Macon Construction
Completion Date: 2019
Scope: Doug Tierney served as Owner’s Representative during the new construction of 53units of luxury residences in Chicago’s Lincoln Park and Lake view neighborhoods. Building amenities include a fitness center, a spectacular roof deck with views of downtown Chicago, bike storage and repair areas, and a dog spa.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: RODE Architects, Inc
Contractor: Callahan Construction Managers
Scope: TDS is the Owner’s Representative for this mixed-use, 107-unit, Passive House certified new Smart Growth development in Cambridge, MA. New Street is one of the first projects to be planned under the City’s new Affordable Housing Overlay (AHO) Zoning District, designed to help affordable housing developers create new, permanently affordable homes more quickly, more cost effectively, and in areas of the city where there are currently fewer affordable housing opportunities. The AHO allows the creation of new, permanently affordable housing that is denser than what might be allowed under base zoning and creates a new review process through which new affordable housing can be approved more efficiently.
Hudson, MA
Client: Metro West Collaborative Development
Architect: Davis SquareArchitects
Contractor: TBD
Scope: TDS is working with Metro West Collaborative Development to create 40 new units of affordable housing in Hudson, Massachusetts. This 100% electric project will utilize heat pumps for both space heating, and domestic hot water, and will achieve Passive House certification once complete.
Pelham, MA
Client: Home City Development
Architect: Architecture EL
Contractor: Western Builder’s Inc
Completion Date: TBD
Scope: The Amethyst Brook Apartments consist of a new 28 unit Passive House building at the site of the former Montague Fly Rod Factory, and a new 6 unit building with historic detailing to match the character of the larger site. The complex project involves significant retaining walls, wetland adjacencies, ledge, and significant elevation changes. TDS is providing pre-construction services, including design reviews and value engineering.
Watertown, MA
Client: Broder
Architect: CBT Architects
Contractor: Suffolk Construction
Completion Date: TBD
Scope: TDS is assisting Broder in the development of an 180,000 square foot lab building, five story freestanding parking garage, and an outdoor pavilion.
Somerville, MA
Client: Preservation of Affordable Housing (POAH)
Architect: ICON Architecture
Contractor: Dellbrook /JKS
Completion Date: TBD
Scope: The redevelopment of Clarendon Hill apartments involves the demolition of three buildings of dilapidated 1940’s housing stock and the new construction of an168 unit modular housing complex.
Arlington, MA
Client: Housing Corporation of Arlington
Architect: Davis SquareArchitects, Inc.
Contractor: Delphi Construction
Completion Date: December 2021
Scope: The two Downing Square / Broadway Initiative projects are composed of three new low-and mid-rise buildings on challenging sites in Arlington, Massachusetts. The wood framed buildings all meet the new Stretch Energy Code, with detailed air sealing, compartmentalization between units, and continuous exterior insulation. The ground floor of the mixed-use Broadway project will be the new home of the Arlington Eats Market.
Springfield, MA
Client: Home City Development
Architect: Architecture EL
Scope: TDS is providing design reviews and pre-construction assistance for the new construction of 40 units of homeownership at a former industrial site in Springfield. The project team has been working to find the most economical way to overcome complex geotechnical and environmental constraints, while still delivering ultra-high performance energy efficient construction.
Mashpee, MA
Client: Preservation of Affordable Housing (POAH)
Architect: Dream Collaborative
Contractor: Delphi
Completion Date: Summer 2024
Scope: The construction of LeClaire Village at 950 Falmouth Road in Mashpee will provide39 new units of critical affordable housing to Cape Cod. TDS’ John Cavacas is providing both Owner’s Project Management and Clerk-of-the-Works services.
Chicago, IL
Client: Broder
Architect: Pappageorge Haymes Partners
Contractor: Macon Construction
Completion Date: 2019
Scope: Doug Tierney served as Owner’s Representative during the new construction of 41units of luxury residences in Chicago’s Lincoln Park neighborhood. Building amenities include a fitness center, business center, guest suite for out-of-town visitors, private roof decks, swimming pool, underground garage, patios with fire pits and large format chess board, bike storage and repair areas, and a dog spa.
Chicago, IL
Client: Broder
Architect: Pappageorge Haymes Partners
Contractor: Macon Construction
Completion Date: 2019
Scope: Doug Tierney served as Owner’s Representative during the new construction of 24luxury condominiums in Chicago’s Lincoln Park neighborhood. Building amenities include a fitness center, business center, private roof decks, swimming pool, underground garage, patios with fire pits and large format chess board, bike storage and repair areas, and a dog spa.
Boston, MA
Client: Lena New Boston
Architect: Davis Square Architects
Contractor: NEI
Completion Date: Summer 2024
Scope: Olmsted Green consists of 80 new units of homeownership at the site of the formerBoston State Hospital in Mattapan. The project is the fourth phase of a five phase project and is expected to start in late 2022. TDS is providing owner’s project management and Clerk-of-the-Works services.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: ICON Architecture
Contractor: Dellbrook | JKS
Completion Date: Winter 2023
Scope: The sea of underutilized parking lots surrounding Rindge Towers off Alewife BrookParkway will soon help alleviate the city’s affordable housing shortage. The first of two PHIUS-certified buildings is expected to go into construction in late2021 and will include three and half levels of community space, commercial offices, and pre-kindergarten programming below two and a half levels of housing. The project must solve complex circulation, access control, acoustic challenges, and mixed construction types to combine all three uses into a harmonious building. Phase 2 will create an eight-story building at the southwest corner of the site. Both buildings must be constructed within tight footprints while maintaining the Owner’s ongoing operations at the Rindge Tower!
Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: Bald Hill Builders
Completion Date: Summer 2023
Scope: Responding to the increasing demand for high quality independent senior living with integrated support services, Hebrew Senior Life will be adding another wing to its Simon C Fireman Community. The wing will add 45 new units to the original 160 and will be Passive House certified. TDS is acting as the Owner’s Representative, and Peter Rex is serving as Clerk-of-the-Works.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: Davis Square Architects, Inc.
Contractor: Callahan Construction
Completion Date: October 2021
Scope: Almost every imaginable construction type comprised the 13 buildings in Squirrelwood Apartments: new construction, scattered site rehab, a substantial addition to an existing building, historic renovations, Passive House certification, nine phased relocations, and one occupied rehab that needed to be reconfigured mid-project to phased relocation due to COVID-19. The 14-unit Passive House building has the distinction of being measured in 2021 as the 4th tightest building in the United States!
Westminster, MA
Client: Commonwealth Community Developers
Architect: Winslow Architects, Inc
Contractor: Delphi Construction
Completion Date: Early 2025
Scope: TDS is providing plan review, pre-construction, and project management services for Westminster Apartments. When complete, the project will provide 40 new senior units adjacent to the Westminster senior center. In addition to numerous amenity spaces for seniors, the development includes both a gym and a long walking trail around the forested grounds. This 100% electric project will utilize heat pumps for both space heating and domestic hot water, and a large solar array feeding both systems.
Yarmouth, MA
Client: Commonwealth Community Developers
Architect: Winslow Architects, Inc
Contractor: Delphi Construction
Completion Date: End of 2021
Scope: TDS has provided plan reviews and project management services to the developer of YarmouthGardens, delivering 40 new affordable units on the site of the former YarmouthGardens Motor Lodge. The old motor lodge is making way for two new 2-story buildings featuring contemporary design, competitive amenities, desirable floor plans and high-end designer finishes. The development will offer 40 one-, two-, and three-bedroom affordable apartment rentals in a family-friendly community conveniently located near local shopping, dining, and recreational opportunities. Accessible units are designed to accommodate mobility and/or sensory impairments. TDS employee John Cavacas is serving as Clerk-of-the-Works.
New Bedford, MA
Client: New Bedford Development Corporation,
E3 Development LLC
Architect: Stantec
Contractor: DF Pray
Scope: The mixed-use re-development at 117 Union Street combines historic preservation, new construction, and ground floor retail. When complete, the project will provide 45 new units of workforce housing to downtown New Bedford.
Chicago, IL
Client: Broder
Architect: Pappageorge Haymes Partners
Contractor: Macon Construction
Completion Date: 2019
Scope: Doug Tierney served as Owner’s Representative during the new construction of 53units of luxury residences in Chicago’s Lincoln Park and Lake view neighborhoods. Building amenities include a fitness center, a spectacular roof deck with views of downtown Chicago, bike storage and repair areas, and a dog spa.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: RODE Architects, Inc
Contractor: Callahan Construction Managers
Scope: TDS is the Owner’s Representative for this mixed-use, 107-unit, Passive House certified new Smart Growth development in Cambridge, MA. New Street is one of the first projects to be planned under the City’s new Affordable Housing Overlay (AHO) Zoning District, designed to help affordable housing developers create new, permanently affordable homes more quickly, more cost effectively, and in areas of the city where there are currently fewer affordable housing opportunities. The AHO allows the creation of new, permanently affordable housing that is denser than what might be allowed under base zoning and creates a new review process through which new affordable housing can be approved more efficiently.
Watertown, MA
Client: Broder
Architect: CBT Architects
Contractor: Suffolk Construction
Completion Date: TBD
Scope: TDS is assisting Broder in the development of an 180,000 square foot lab building, five story freestanding parking garage, and an outdoor pavilion.
Arlington, MA
Client: Housing Corporation of Arlington
Architect: Davis SquareArchitects, Inc.
Contractor: Delphi Construction
Completion Date: December 2021
Scope: The two Downing Square / Broadway Initiative projects are composed of three new low-and mid-rise buildings on challenging sites in Arlington, Massachusetts. The wood framed buildings all meet the new Stretch Energy Code, with detailed air sealing, compartmentalization between units, and continuous exterior insulation. The ground floor of the mixed-use Broadway project will be the new home of the Arlington Eats Market.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: ICON Architecture
Contractor: Dellbrook | JKS
Completion Date: Winter 2023
Scope: The sea of underutilized parking lots surrounding Rindge Towers off Alewife BrookParkway will soon help alleviate the city’s affordable housing shortage. The first of two PHIUS-certified buildings is expected to go into construction in late2021 and will include three and half levels of community space, commercial offices, and pre-kindergarten programming below two and a half levels of housing. The project must solve complex circulation, access control, acoustic challenges, and mixed construction types to combine all three uses into a harmonious building. Phase 2 will create an eight-story building at the southwest corner of the site. Both buildings must be constructed within tight footprints while maintaining the Owner’s ongoing operations at the Rindge Tower!
Boston, MA
Client: Back of the Hill CDC
Architect: Mix Design and Development LLC
Contractor: Various
Completion Date: Summer 2022
Scope: TDS is assisting Back of the Hill CDC in the execution of a new model of affordable homeownership development. Instead of relying on state and federal subsidies to create this affordability, BOTH CDC is exploring a direct connection to sellers, allowing them to capture the tax incentives of selling to BOTH CDC at below market prices. BOTH CDC then packages these acquisitions savings with a renovation geared to affordability, and passes those savings onto new homeowners. TDS helped develop the proforma, retained all third party consultants, and helped the Owner act as its own general contractor, directly hiring all subcontractors.
Springfield, MA
Client: Home City Development
Architect: Architecture EL
Scope: TDS is providing design reviews and pre-construction assistance for the new construction of 40 units of homeownership at a former industrial site in Springfield. The project team has been working to find the most economical way to overcome complex geotechnical and environmental constraints, while still delivering ultra-high performance energy efficient construction.
Boston, MA
Client: Lena New Boston
Architect: Davis Square Architects
Contractor: NEI
Completion Date: Summer 2024
Scope: Olmsted Green consists of 80 new units of homeownership at the site of the former Boston State Hospital in Mattapan. The project is the fourth phase of a five phase project and is expected to start in late 2022. TDS is providing owner’s project management and Clerk-of-the-Works services.
Randolph, MA
Client: Hebrew Senior Life
Architect: ICON Architecture
Contractor: South Coast Improvements
Completion Date: Early 2022
Scope: The 160-unit SimonC Fireman Community is undergoing a transformation to provide residents with a host of new finishes, new bathrooms, windows, flooring, lighting, paint, and electrical load centers. Ten units will be reconfigured for seniors with disabilities. The building must also consider a proposed addition and exterior improvements while designing and implementing the current improvements. TDS is acting as the Owner’s Representative, and Peter Rex is serving asClerk-of-the-Works.
Methuen, MA
Client: Standard Communities
Architect: Union Studio
Contractor: Iron Fish Construction
Completion Date: 2023
Scope: TDS is providing plan review, pre-construction, and project management services for the common area upgrades to Mill Falls Apartments. The project includes replacement of all common area finishes, and a reconfiguration of the ground floor lobby, mail room, and management office spaces. In addition, the scope includes installation of new exterior lighting along the façade that over looks the scenic Spicket River.
Cambridge, MA
Client: Just-A-Start Corporation
Architect: Davis Square Architects, Inc.
Contractor: Callahan Construction
Completion Date: October 2021
Scope: Almost every imaginable construction type comprised the 13 buildings in Squirrelwood Apartments: new construction, scattered site rehab, a substantial addition to an existing building, historic renovations, Passive House certification, nine phased relocations, and one occupied rehab that needed to be reconfigured mid-project to phased relocation due to COVID-19. The 14-unit Passive House building has the distinction of being measured in 2021 as the 4th tightest building in the United States!
Just getting started or mid-project, we’re here to help.